HYPERMIST SYSTEM

1) CHECK THAT THE SYSTEM IS LINED UP CORRECTLY.
2) CHECK PUMP IN AUTO MODE AND NO ALARMS ON THE FIRE CONTROL PANEL IN THE MSB ROOM.
3) TRYOUT AT LEAST ONE ZONE SPRINKLER RELEASE IN CONTROLLED MODE.
4) CHECK PUMP PRESSURE WHEN SYSTEM IS TESTED.
5) CHECK SPRINKLER HEADS FOR CLARITY (NO PAINT DEPOSITS ETC..)

CO2 SYSTEM

1) CHECK KEY IS IN PLACE.
2) CHECK INTEGRITY OF ALL THE CONNECTIONS
3) CHECK ALL CO2 HEADS FOR CLARITY
4) CHECK ROOM DOORS AND CABINET DOOR.
5) BLOW THROUGH WITH AIR.

QUICK CLOSING VALVE

1) VISUALLY INSPECT THE SYSTEM.
2) CHECK THE AIR PRESSURE IN THE BOTTLE
3) TRY OUT AT LEAST ONE SECTION OF QCVS. OR INDIVIDUAL VALVE FOR PROPER OPERATION

REMOTE TRIPS

1) FUNCTION TEST ONE SECTION AT A TIME..

EM'CY FIRE PUMP

1) ENSURE PUMP IS LINED UP AND READY FOR IMMEDIATE USE
2) TRIAL RUN FOR 10MINS AND RECORD THE PRESSURE GENERATED WITH TWO FIRE HOSES RIGGED.
3) CHECK FOR LEAKAGES

EM'CY GENERATOR

1) CHECK  LO, FO, COOLING WATER LEVELS
2) CHECK E/GEN ON AUTO MODE.
3) TEST RUN THE ENGINE ON BATTERY MODE AND HYDRAULLIC STARTING MODE
4) CHECK OIL LEVEL IN HYD OIL TANK
5) TEST RUN ON LOAD FOR AT LEAST 30 MIN AND CHECK AVAILABILITY OF POWER AT SERVICES PROVIDED BY E/GEN.

SCBA COMPRESSOR

1) CHECK THE CONDITION OF CHARGING HOSES AND THE CONNECTIONS.
2) ENSURE ALL SCBA BOTTLES ARE FULLY CHARGED
3) CHECK OIL LEVEL IN THE SUMP
4) CHECK THE COMPRESSOR CUT OFF FUCNTION AT 300 BAR.

LIFE BOAT ENGINE

1) CHECK LO, FO AND COOLING WATER LEVEL.
2) TEST RUN THE ENGINE IN ALL RUNNING DIRECTIONS
3) CHECK SPRINKLER PUMP DRIVING MECHANISM

RESCUE BOAT ENGINE

1) CHECK LO, FO AND COOLING WATER LEVEL
2) TEST RUN THE ENGINE IN ALL RUNNING DIRECTIONS.

VENTILATION FLAPS

1) FUCNTION CHECK.
2) CHECK FOR ANY AIR LEAKS.

FIRE HYDRANTS AND HOSES

1) CHECK THAT ALL HOSES ARE IN PLACE AND GENERAL CONDITIONS ARE SATISFACTORY
2) CHECK FOR FREENESS OF NOZZLES, AND GREASE ACCORDINGLY.
3) PRESSURE TEST ALL HOSES ONCE IN THREE MONTHS

EM’CY BILGE SUCTION

1) OPERATE AND GREASE.

S.W. RECIRC. V/V

1)  OPERATE FROM REMOTE AND LOCAL STATIONS AND CONFIRM THE OPERATION.

STEAM SMOTHERING SYSTEM

1) CARRY OUT VISUAL INSPECTION OF THE SYSTEM AND CHECK INDIVIDUAL
UNIT V/V FOR FREENESS

INCINERATOR

1) TRY OUT TRIPS AND ALARMS.

SHIP SIDE V/V

1) OPERATE AND GREASE

FIRE AND GAS DETECTION EQUIPMENTS

1) TEST ALL THE SENSORS ONCE IN THREE MONTHS.

BILGE ALARMS

1) FUCNTION CHECK

BATTERIES AND CHARGERS


1)CHECK THE BATTERY TERMINALS,APPLY PETROLEUM JELLY.

2) CHECK THAT THE BATTERY IS FULLY CHARGED.
3) EVERY QUARTER DISCHARGE ROUTINE TO BE CARRIED OUT.
4) AFTER STARTING EM’CY GEN KEEP THE BATTERY IN EQUALISING  CHARGE
TILL BATTERY VOLTAGE REACHED TO 27 V, THEN CHANGE OVER SWITCH TO
FLOATING CHARGE POSITION.

CRANES

1) FUCNTION CHECK THE LIMIT SWITCHES

REF. CHAMBER ALARM

1) FUCNTION CHECK

O.W.S. 15 PPM

1) FUCNTION TEST OF 15-PPM ALARM AND CHANGING OVER OF O/B V/V

ELE. EM’CY TRIPS

1) CARRY OUT FUNCTION TEST
2) CONFIRM  ALL BREAKERS ASSOCIATED WITH  THE GROUP HAVE TRIPPED.

EM’CY LIGHTING

1) FUCNTION CHECK

COMMUNICATION EQUIPMENTS

1) FUCNTION CHECK

HAZ. AREA EQUIPMENTS

1) CHECK PHYSICAL CONDITION OF THE EQUIPMENT
2) CHECK THE BONDING

M/E EM’CY MANOEUVRING

1) TRY OUT M/E FROM LOCAL MANOEUVRING STATION.

EM’CY STEERING

1) TRY OUT STEERING FROM LOCAL STATION.

MACHINERY TRIPS

1) TRY OUT TRIPS AND ALARMS FOR MACHINERIES AS PER INDIVIDUAL SCHEDULES

BLACKOUT TEST

1) CARRY OUT BLACK OUT TEST AND CHECK SEQUENTIAL START

EMERGENCY SHOWER

1) OPERATIONAL CHECK TO BE CARRIED OUT.
2) OBSERVE THE COLOUR OF WATER.